This paper was first published in the Canadian Journal of Civil Engineering, Vol. 21, 1994 pp 939-953, under the title "A Pragmatic Approach to Using Resource Loading, Production and Learning Curves on Construction Projects". It has been modified only to the extent necessary to make it presentable in web page format.

Abstract | Introduction | Resource Loading | S-curves | What can be Learned?
Productivity Improvement | Learning vs. Experience | Original Theory | Two Approaches
Illustration | Issues | Conclusions | References | Appendix 1 | Appendix 2

References

Adrian, J. J. 1987. Construction Productivity Improvement. Elsevier Science Publishing Co., Inc., New York. p 154.

Allen, W. 1979. Developing the Project Plan. Notes prepared for Engineering Institute of Canada Annual Congress Workshop. Toronto. pp 3-9.

Barrie, D. S. and Paulson, Jr. B. C. 1978. Professional Construction Management. McGraw-Hill, New York. p 224.

Chellew, J. H., 1974. The use of the learning curve. Proceedings PMI Seminar/Symposium, Drexel Hill, Pennsylvania. p 163.

Christian, J., and Kallouris, G. 1991. An expert system for predicting the cost - time profiles of building activities. Canadian Journal of Civil Engineering, Vol. 18, 1991, Ottawa, Ontario. Fig. 3, p 814.

Defense Systems Management College, 1989. Applying Learning Curve Theory to Actual Data. PMI Seminar/Symposium Education Workshop, Drexel Hill, Pennsylvania. p 1.

Drewin, F. J. 1982. Construction Productivity - Measurement and Improvement through Work Study. Elsevier Science Publishing Co., Inc., New York. p 102.

Kerzner, H. 1989. Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Van Nostrand Reinhold, New York. pp 804-809.

Meredith, J. R. and Mantel, Jr. S. J. 1985. Project management - A Managerial Approach. John Wiley & Sons, New York. p 328.

National Electrical Contractors Association (NECA), 1983. Rate of Manpower Consumption in Electrical Construction. Bethesda, Maryland. p 10.

Thomas H. R., Mathews C. T. and Ward J. G. 1986. Learning Curve Models of Construction Productivity. Journal of Construction Engineering and Management, ASCE, New York. p 250.