The Pocket Guide for Those Daring Enough to Take Responsibility for Large Industrial Projects
By Jean-Pierre Capron, 2012
Table of Contents
Interestingly, this book is written in unnumbered "Sections", the most significant of which are:
- Introduction
- Main Steps in the Life of a Project
- On Organizational Matters
- About tendering
- On Negotiating Fixed-Price Turnkey Contracts
- Launching a Project
- In the Heat of Battle
- Knowing How to Conclude a Project
- Project Control Basic Principles and Tools
- Some General Thoughts by Way of Conclusion
The total number of pages in this book is 122. There is no Glossary of Terms.
|
|