Analysis - 1
 
 
 
8. Conduct sensitivity study
    
  
- Test sensitivity of major cost elements
        - By changing input values and assumptions         
      
 
- Examine effects of changing schedule or sequence   
  
- From the study, identify which assumptions, cost drivers and elements are affected most by the changes   
9. Conduct uncertainty & risk analysis
  
- 
  Characterize risks associated with each WBS element
  
- Determine probability and impact for each main risk
- 
  Calculate minimum, most likely and maximum ranges
  
- 
  Hence, identify confidence level of estimate total
  
- 
  Determine contingency needed for a risk adjusted total
  
- Recommend plan for tracking and mitigating risks