What am I looking for, and how long should the workshop take?
 
 
- The Scope-Pak approach results in eight project planning documents
- 
- As listed on Page 2 of this Issacon
 
- A well-prepared Scope-Pak workshop can be conducted in one hour
- At the end of that time you quit
- Absolutely and positively!
 
- It does not require a lot of time