1. Negligible cost or inconvenience
2. Facility, service, system or product operation downgraded at limited cost
3. Significant downgrade at serious cost
4. Serious downgrade resulting in serious cost
5. Results in total loss of operation
| Previous slide | Next slide | Back to first slide | View graphic version |