Level 2 MBM-type people
 
 
	The ideal MBM behavior features 
- A high aptitude for the mastery of tools
- A career long MBM practitioner 
- Myers-Briggs typology ISTP 
- (Introverted/Sensing/Thinking/Perceptive) 
- A "Craft" person
- Representing about 10% of the population
 
	Editor's Note: the actual characteristics of type ISFJ (Introvert/Sensing/Feeling/Judging) might be more suited