Implementation Phase - 6
 
 
(b) Engineering and Design
- Assessment of client definition
- Optimization of concept
- Detailed final flow sheets, detailed final layouts
- Finalize design manuals
- Drawing schedules
- Management of design subcontractors
- Detailed design and construction drawings
- Preparation of specifications, all disciplines
- Value engineering
- Technical back up to procurement
- Requisition for purchase of equipment