8. Scope breakdown structure covering complete Systems Scope description developed
9. Scope of Work (I.e. activity descriptions) required to accomplish each System Scope Description (or Work Package) developed
10. Implementation Plan Developed
| Previous slide | Next slide | Back to first slide | View graphic version |