Assumptions: Scope - 2
Scope planning
- Integration will not be a problem
- Or has been specifically addressed
- A work breakdown structure (WBS) has been developed
- A scope of work based on the WBS has been developed
- Or can be
- Suitable for preparing time and cost estimates